Renfe
26 trains of the 103 series, called Velaro E
Vehicles | 26 High-Speed VELARO E trains of 8 cars |
---|---|
Distributed traction | 4 motor cars and 4 trailer cars in alternate position |
Power / Electricity supply | 12,000 CV – 16 traction motors of 550 kW / 25 kV (50Hz) |
Tare – Maximum weight | 430 tonnes – 465 tonnes |
Regular – maximum speed | 300 km/h – 350 km/h |
Signalling systems | ETCS N1 and N2, LZB and ASFA |
Capacity | 405 seats and 2 PRM spaces |
On-board services |
|
Vehicles | RENFE FABRICACIÓN Y MANTENIMIENTO |
---|---|
Fleet maintained | 26 trains of the 103 series, called Velaro E |
Routes | The 103 series currently focuses its operations on the Northeast corridor, it being the key train used in commercial services between Madrid and Barcelona. To a lesser extent, but regularly, it is used for commercial services between Madrid and Malaga. |
Scope of the contract | Comprehensive maintenance, including overhauls and cleaning
|
Other services |
|
Key indicators |
|
Avenida Santa Catalina, 14
28053 Madrid
Coordinates: 40º 22' 19.51" N 3º 40' 38.52" O
Contact person: Administrative assistant - Carmen Alía
Telephone: +34 91 786 69 71
Fax: +34 91 786 69 05
Ctra. Toledo a Aranjuez CM-4001, Km.20
45260 Villaseca de La Sagra, Toledo
Coordinates: 39.959246, -3.846298
39°57'33.3"N 3°50'46.7"W
Contact person: Production Administrative Assistant - Sara Herrera
Telephone: +34 925 273 893
How to get here: